- Client / Developer
- Him River Power Limited
- Hydropower project
- LKHP–UCHP 132 kV S/C Transmission Line · Liping Khola HPP, 16.26 MW
- Location
- Sindhupalchok
- Voltage
- 132 kV
- Length
- 15 km
- Circuit
- Single Circuit
- Status
- Completed (certificate dated 05/03/2026)
Scope of work
Survey, design, supply, erection, stringing, testing and commissioning.
Per the client certificate: 40 towers, EPC contract, commenced 15.04.2024, completed 26.02.2026.