- Client / Developer
- Sangrila Urja Pvt. Ltd. / Summit Energy Solution Pvt. Ltd.
- Location
- Sankhuwasabha
- Voltage
- 220 kV
- Length
- 63 km
- Circuit
- Double Circuit
- Status
- Completed
Scope of work
Power evacuation study, construction methodology, economic analysis of transmission line, hub substation and interconnection bays.